Most single-family asphalt shingle roofs take one to three working days to replace. Tile and metal roofs, very large or steep roofs, and jobs that uncover damaged decking commonly take one to two weeks.
How Long Does Each Type of Roof Take?
| Roof type | Typical time on site |
|---|---|
| Asphalt shingles | 1–3 days |
| Flat roof or silicone coating | 2–5 days |
| Standing-seam metal | About 1 week |
| Tile underlayment replacement (lift and relay) | 1–2 weeks |
| New tile roof | 1–2 weeks or more |
For an average single-family home in good weather. Your schedule will be on your written estimate.
What Happens Day by Day?
- Delivery and setup. Materials arrive and we protect landscaping, windows and the driveway.
- Tear-off. The old roof comes off down to the wood, usually on the first day.
- Deck repair. Any soft or rotted decking is replaced.
- Dry-in. Underlayment and flashing go on, which makes the house watertight even before the roofing is finished.
- Roofing. Shingles, tile or metal are installed, then ridge caps and vents.
- Cleanup and walkthrough. Debris is hauled away, the yard is swept for nails, and we walk the job with you.
What Slows a Roof Replacement Down?
- Weather. We do not open a roof if rain is coming.
- Hidden damage. More bad decking than expected adds time.
- Steep or complicated roofs. More safety setup and more flashing work.
- Inspections. City inspections happen at set stages and have to be scheduled.
- Special-order materials. Some tile and metal colors take weeks to arrive, though that happens before work starts.
Can I Stay Home During the Work?
Yes. It is loud, especially during tear-off, so plan for pets, naps and video calls. Move cars out of the driveway and take down anything fragile hanging on the walls of the top floor.
Key Takeaways
- Shingle roofs usually take one to three days.
- Tile and metal take a week or more.
- The house is made watertight early, at the dry-in stage.
- Weather, hidden deck damage and inspections are the usual delays.